February 12, 2019 - March 29, 2019 (45 days) Closed
Last updated
A new Environmental Compliance Approval (Industrial Sewage) has been granted for 2528472 Ontario Inc., for the stormwater management works to service proposed Allenford Gas Bar, Convenient Store and Restaurant development. This is located at 7848 Highway 21 (at Country Road 10), in the Township of Arran, Ontario.
December 13, 2018 - January 27, 2019 (45 days) Closed
Last updated
Approval granted for a new Environmental Compliance Approval (Sewage) for the approval of storm sewers to be constructed on Street "A", Street "B", Rougham Road, Lion's Park Drive and Queen Street; and sanitary sewers on Street "A", Street "B", Lion's Park Drive and Queen Street.
July 30, 2018 - September 18, 2018 (45 days) Closed
Last updated
Approval granted to the proposal to establish a stormwater management works structure servicing a proposed new MacEwen Gas Station, complete with a commercial "C Store", underground tanks, canopy and pump, located at 235 Military Road South, in the Township of South Glengarry, Ontario.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
013-3983
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 30, 2018 - November 29, 2019 (30 days) Closed
Last updated
Official Plan Amendment No 2 (the five-year review of the Township of Armour Official Plan) adopted in accordance with section 17(34) and 21 is final and not subject to appeal. Accordingly, Official Plan Amendment No 2, as approved with modifications by the Minister, came into effect on May 15, 2019.
We amended the Renewable Energy Approval for the Toronto Zoo Anaerobic Digester Project for minor changes to equipment and improvements to stormwater management.
Instrument type:
Changes to the conditions of a licence to operate a pit or quarry
ERO number
013-4830
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 7, 2019 - April 22, 2019 (46 days) Closed
Last updated
The application made by O. Bettschen Construction Limited to amalgamate Licence #2409 and Licence #625121 as one operation, licensed under #2409 has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-4827
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 7, 2019 - April 22, 2019 (46 days) Closed
Last updated
The application for O. Bettschen Construction Limited for a major site plan amendment to change the final depth of extraction from above the water table (160 metres above sea level) to extraction below the water table to an elevation of 146 metres for two adjacent quarry sites has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
012-1695
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 28, 2014 - May 28, 2014 (30 days) Closed
Last updated
The application for a site plan amendment for Lafarge Canada Inc. operator of a Class A pit (Oro Pit – ARA licence #3553) with extraction occurring above the water table on a 165.64 hectare ARA licence has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-4218
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 6, 2018 - January 7, 2019 (32 days) Closed
Last updated
The application for Drain Bros. Excavating Limited for a major site plan amendment to reduce the excavation setback area along portions of the south extraction limit of Licence # 3350 (Havelock Quarry) has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-0055
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 16, 2017 - April 18, 2017 (33 days) Closed
Last updated
The application which E.S. Johnston Farms Ltd. submitted to amend their current site plan to revise the phasing of extraction on site, has been approved.
Instrument type:
Changes to the conditions of a licence to operate a pit or quarry
ERO number
013-4466
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 15, 2019 - December 2, 2019 (32 days) Closed
Last updated
Application has been grated to D’Arcey Sand & Gravel Ltd. to vary a condition their current licence to authorize an increase in the number of tonnes of aggregate to be removed in a calendar year.
February 22, 2019 - April 8, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) has been granted to Rosscomm Holdings Ltd., a hot-mix asphalt plant, located at 10 Freshway Drive, Vaughan, Ontario.