October 28, 2019 - November 27, 2019 (30 days) Closed
Last updated
Bill 132, The Better for People, Smarter for Business Act 2019, received Royal Assent on December 10, 2019 and amended the Crown Forest Sustainability Act, the Oil, Gas and Salt Resources Act and the Lakes and Rivers Improvement Act (LRIA).
Ontario Regulation 102/20 Monitoring of Mercury Near Dams under the LRIA was approved on March 30, 2020.
Instrument type:
Classification, reclassification or declassification of a pesticide
ERO number
019-1381
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
February 24, 2020 - March 25, 2020 (30 days) Closed
Last updated
We have classified the following commercial end use product: HopGuard II (Reg. No. 33571), containing the active ingredient hop beta acids (present as potassium salts), as Class 4 pesticides.
Instrument type:
Classification, reclassification or declassification of a pesticide
ERO number
019-1378
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
February 25, 2020 - March 26, 2020 (30 days) Closed
Last updated
We have classified the following commercial end use product Avodigen (Reg. No. 33311), containing the new active ingredients: Bacillus licheniformis strain FMCH001 and Bacillus subtilis strain FMCH002, as Class 3 pesticides.
Instrument type:
Classification, reclassification or declassification of a pesticide
ERO number
019-1379
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
February 24, 2020 - March 25, 2020 (30 days) Closed
Last updated
We have classified the following two commercial end use products containing the new active ingredient mefentrifluconazole: Cevya (Reg. No. 33405) and Maxtima (Reg. No. 33406), as Class 2 pesticides.
February 27, 2020 - April 12, 2020 (45 days) Closed
Last updated
A Certificate of Property Use was issued to Center Ice Developments GP Corp. for, and on behalf of, Center Ice LP for the intended mixed use of the property located at 617 to 621 and 617 to 621 King Street West in the City of Kitchener.
September 5, 2019 - October 20, 2019 (45 days) Closed
Last updated
We issued an Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise) to Fenner Dunlop (Bracebridge), Inc., a manufacturer of conveyor belting used for the mining and industrial industries, located in Bracebridge, Ontario.
February 19, 2020 - April 4, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted to K & G Martin Holdings Inc. for stormwater management works serving a new gravel parking and display area located at 270 Arthur Street North in Elmira, Township of Woolwich.
February 26, 2020 - April 11, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted to Sunrise Freight Systems Inc. or the construction of stormwater management facilities at 50 Sloan Drive, Town of Caledon, Ontario.
September 18, 2019 - November 2, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval has been issued for storm sewers serving KRS Holdings Wingham Inc., located at 82 Kerr Drive, in the Town of Wingham.
February 20, 2020 - April 5, 2020 (45 days) Closed
Last updated
We have cancelled the Environmental Compliance Approval (Industrial Sewage) application for Polycorp Ltd., a rubber products manufacturing facility, located at 33 York Street West in Elora (Centre Wellington), Ontario.
Instrument type:
Approval of a program to prevent, reduce or control discharge
ERO number
019-0978
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 3, 2019 - January 17, 2020 (45 days) Closed
Last updated
The Program Approval was issued to Nortel Networks International Corporation to prevent or to reduce and control the discharge into the natural environment of any contaminant from the source of the contaminant of a site in London, Ontario.
October 28, 2019 - December 12, 2019 (45 days) Closed
Last updated
We have amended the Pesticides Regulation under the Pesticides Act to reduce complexity and modernize pesticide management in Ontario while ensuring strong protection for human health and the environment.
September 25, 2019 - November 9, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval has been granted for 2030470 Ontario Limited for stormwater management works to serve the Rosedale Cross Dock facility located at 9460 Mitch Owens Road in Ottawa.
We have approved a new Environmental Compliance Approval for Orillia Power Distribution Corporation to install a new secondary oil containment system, as part of a proposed electrical utility distribution substation, located at 4600 Uhthoff Line, in the City of Orillia.
A new Environmental Compliance Approval (ECA) No. 7934-BHGQP4 was issued on March 31, 2020 to John Zubick Limited for a waste transfer and processing site, located in London, Ontario, for end-of-life vehicles, recyclables and a public drop-off facility.
November 25, 2019 - January 9, 2020 (45 days) Closed
Last updated
An Environmental Compliance Approval (air) was issued to Reynolds Consumer Products Canada Inc./Produits de Conssommation Reynolds Canada Inc. for all emission sources from the facility that exhaust to the atmosphere.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1650
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 14, 2020 - May 14, 2020 (30 days) Closed
Last updated
Original Traders Energy (OTE), a supplier and distributer petroleum products, is building a new facility at 180 Industrial Park Drive, Shannonville, Ontario, K0K 3A0. The company wants to *manifold the *Stage I vapour recovery header on the loading skid for the underground storage tanks at this site.