We issued an Environmental Compliance Approval to Clean Harbors Canada, Inc. for their 520 Southgate Drive, Guelph location.
This amended approval allows a 60% increase in the storage of liquid hazardous wastes, additional solid hazardous waste storage, and the construction of an outdoor solidification pit for liquid industrial waste.
Permit to Take Water No. P-300-1273040077 was issued to Vale Canada Limited/Vale Canada Limitée on August 29, 2024, to renew Permit to Take Water No. 5833-9KAJQ2 for mining dewatering purposes. Water will be taken from three ponds, located in Greater Sudbury, Ontario for 10 years.
We want your feedback on two consultants' reports on rainwater and runoffs. This will help us develop a stormwater management guide. The ultimate goal of stormwater management is to maintain the health of streams, lakes and aquatic life.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 2935-9SSSSB for FCA Canada Inc., an automotive assembly facility located in the City of Windsor, Ontario.
September 5, 2024 - October 20, 2024 (45 days) Closed
Last updated
We are proposing to amend four regulations related to producer responsibility under the Resource Recovery and Circular Economy Act, 2016. These changes would increase flexibility, reduce burden and simplify requirements for producers while ensuring that the environment and consumers are protected.
September 5, 2024 - October 21, 2024 (46 days) Closed
Last updated
We are proposing an update to the Independent Forest Audit Process and Protocol.
The proposed revisions will address recommendations from a recent review of Ontario Regulation 319/20: Independent Forest Audits. The goal is to improve the efficiency and effectiveness of independent forest audits across the province’s managed forests.
December 22, 2020 - February 20, 2021 (60 days) Closed
Last updated
As committed to in our Made-in-Ontario Environment Plan, the MECP is proposing an amendment to its Statement of Environmental Values (SEV) in order to reflect changes in its mandate, to fulfill a commitment in the Made-in-Ontario Environment Plan with the addition of a climate change section, and to add a five-year review period.
February 17, 2023 - March 19, 2023 (30 days) Closed
Last updated
This proposal is to renew the Permit to Take Water No. 7347-8VXPMJ for Oakland Greens Golf & Country Club Inc. Water will be taken from one well and one pond for golf course irrigation and water supply purposes, located at 1993 Asphodel 7th Line in Norwood, Ontario.
September 29, 2022 - November 13, 2022 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval No. 6991 BRJQVM for sewage works servicing the Lactalis dairy products manufacturing plant, located at 490 Gordon Street in Winchester, Ontario.
February 11, 2022 - March 28, 2022 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval (sewage) No. 0522-98MLKK for Calabogie Peaks Inc. for sewage works to service the existing and proposed developments at Calabogie Peaks Resort, located at 30 Barrett Chute Road in Calabogie, Ontario.
This proposal is for an amendment to the Environmental Compliance Approval with Limited Operational Flexibility (air and noise) No.1993-A9UKGD for Evolve Recycling Inc., a facility which shreds and processes scrap tires to produce crumb rubber for further applications, located in Brantford, Ontario.
January 6, 2021 - February 20, 2021 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Evolve Recycling Inc. This proposal is for the collection, transmission and disposal of stormwater runoff at the tire recycling facility located at 300 Henry Street, Brantford.
November 26, 2020 - January 10, 2021 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval No. 6785-9BXPTC for Vale Canada Limited for the emissions from the Copper Cliff Smelter, a pyrometallurgical smelter located in Copper Cliff, Ontario.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9117
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
September 5, 2024 - October 7, 2024 (32 days) Closed
Last updated
R.W. Tomlinson Limited seeks to amend the current site plan to change the final rehabilitation from a pond to a filled-to-grade landform, allowing for the importation of excess soils.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9116
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
September 5, 2024 - October 7, 2024 (32 days) Closed
Last updated
Washington Sand & Gravel Ltd. has applied to amend the site plan to allow for the importation of excess soil to backfill the site to the pre-extraction elevations.
Establishment of industrial stormwater management works for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 11.41 hectares (to be developed for a Refrigerated Warehousing and Storage Facility), to Enhanced Level water quality, erosion protection and quantity control.
The Ministry of Infrastructure has updated its Statement of Environmental Values (SEV) to reflect changes to its organizational structure and expanded mandate.
September 4, 2024 - October 19, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of Environmental Compliance Approval No. A920232-001 for West Nipissing Sanitation Inc. for a Hauled Sewage Waste Disposal Site, located at 694 Olivier Road in Verner, Ontario.