Calabogie Peaks Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-5064
Ministry reference number
1474-CAFL5A
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
February 11, 2022 - March 28, 2022 (45 days) Closed
Last updated

Update Announcement

This proposal notice was updated on September 5, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.

This consultation was open from:

February 11, 2022
to March 28, 2022

Proposal summary

This proposal is for an amendment to Environmental Compliance Approval (sewage) No. 0522-98MLKK for Calabogie Peaks Inc. for sewage works to service the existing and proposed developments at Calabogie Peaks Resort, located at 30 Barrett Chute Road in Calabogie, Ontario.

Location details

Site address

30 Barrett Chute Road
Calabogie, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Calabogie Peaks Inc.
30 Barrett Chute Road
Calabogie, ON
K0J 1H0
Canada

Proposal details

This proposal is for an amendment to Environmental Compliance Approval (sewage) No. 0522-98MLKK for Calabogie Peaks Inc. for sewage works to service the existing and proposed developments at Calabogie Peaks Resort, located at 30 Barrett Chute Road in Calabogie, Ontario.

The proposal is to upgrade and re-rate the existing hotel subsurface sewage disposal system from a design capacity of 131,760 litres per day (43,920 litres per day per module) to 225,000 litres per day (75,000 litres per day per module) by adding new components with additional sewage connections from the existing and proposed accommodation units, as well as to upgrade the maintenance building Class 4 sewage system, with a daily design sanitary sewage flow of 4,600 litres per day.

The proposed sewage works include:

  • one proposed 40,000 litre balancing tank, two proposed 60,000 litre septic tanks and new forcemains for the hotel subsurface sewage disposal system
  • one 13,800 litre septic tank and nine (9) additional 6.1 metre long pipes for the maintenance building Class 4 sewage system

The proposal also includes modifications of the effluent objectives and the associated monitoring program for the hotel subsurface sewage disposal system.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

The comment period was from February 11, 2022
to March 28, 2022

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice