This consultation was open from:
March 18, 2024
to May 2, 2024
Proposal summary
This proposal is for an amendment to the multimedia Environmental Compliance Approval No. 1984-BD9NBD for Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP, operating an anaerobic digester facility located at 100 Eco-Park Way, in the Township of Southgate, Grey County, Ontario.
Location details
Site address
100 Eco-Park Way
Southgate,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP
77 King Street West, Suite 3000
P.O. Box 95
Toronto,
ON
M5K 1G8
Canada
Proposal details
This proposal is for an amendment to the multimedia Environmental Compliance Approval No. 1984-BD9NBD for Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP.
The anaerobic digester facility is located at 100 Eco-Park Way, Township of Southgate, Grey County, Ontario, on a 4-hectare area site. The facility will be using organic residuals from source separated organics, industrial, commercial, institutional commercial and industrial food waste materials, and a blend of agricultural materials such as (energy crops) silage, stover, culled material from vegetable and tuber crops and animal manure to produce renewable natural gas for injection into the natural gas grid, and digestate (organic fertilizer) crop nutrients to local farms.
The service area will be the Province of Ontario and the States of New York, Michigan, and Ohio. The maximum daily waste received will be 700 tonnes of non-hazardous waste and 700 cubic metres of other liquid waste, and the maximum on-site storage capacity will be 400 tonnes of non-hazardous solid waste and 480 cubic metres of other liquid waste.
The facility is currently permitted to process up to 73,000 tonnes of waste annually. The anaerobic digester will operate 24 hours a day, 7 days a week, and the hours of operation for the reception of organic residuals at the facility will be Monday to Friday from 6 am to 10 pm, and Saturday from 6 am to 4 pm.
This amendment requests approval for the revised facility layout, which will include minor process changes made necessary by the acquisition of additional land adjacent to the original site in 2022. These changes include:
- a biofilter for improved odour control
- changes in tank and combined heat and power sizes
- the use of process water and double membrane roofs
- the addition of boilers
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from March 18, 2024
to May 2, 2024