This proposal is for an amendment to the multimedia Environmental Compliance Approval No. 1984-BD9NBD for Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP, operating an anaerobic digester facility located at 100 Eco-Park Way, in the Township of Southgate, Grey County, Ontario.
Détails de l'emplacement
Adresse du site
100 Eco-Park Way
Southgate,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP
77 King Street West, Suite 3000
P.O. Box 95
Toronto,
ON
M5K 1G8
Canada
Détails de la proposition
This proposal is for an amendment to the multimedia Environmental Compliance Approval No. 1984-BD9NBD for Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP.
The anaerobic digester facility is located at 100 Eco-Park Way, Township of Southgate, Grey County, Ontario, on a 4-hectare area site. The facility will be using organic residuals from source separated organics, industrial, commercial, institutional commercial and industrial food waste materials, and a blend of agricultural materials such as (energy crops) silage, stover, culled material from vegetable and tuber crops and animal manure to produce renewable natural gas for injection into the natural gas grid, and digestate (organic fertilizer) crop nutrients to local farms.
The service area will be the Province of Ontario and the States of New York, Michigan, and Ohio. The maximum daily waste received will be 700 tonnes of non-hazardous waste and 700 cubic metres of other liquid waste, and the maximum on-site storage capacity will be 400 tonnes of non-hazardous solid waste and 480 cubic metres of other liquid waste.
The facility is currently permitted to process up to 73,000 tonnes of waste annually. The anaerobic digester will operate 24 hours a day, 7 days a week, and the hours of operation for the reception of organic residuals at the facility will be Monday to Friday from 6 am to 10 pm, and Saturday from 6 am to 4 pm.
This amendment requests approval for the revised facility layout, which will include minor process changes made necessary by the acquisition of additional land adjacent to the original site in 2022. These changes include:
- a biofilter for improved odour control
- changes in tank and combined heat and power sizes
- the use of process water and double membrane roofs
- the addition of boilers
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 18 mars 2024
au 2 mai 2024