This consultation was open from:
January 24, 2024
to March 9, 2024
Proposal summary
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works to serve Southgate Renewables, located at 100 Eco Park Way in Southgate, Ontario.
Location details
Site address
100 Eco-Park Way
Southgate,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP
77 King Street West, Suite 3000
P.O. Box 95
Toronto,
ON
M5K 1G8
Canada
Proposal details
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works to serve Southgate Renewables, located at 100 Eco Park Way in Southgate, Ontario.
The stormwater management works comprise of Stormwater Quality Control, Quantity Control, and Erosion Control works, and include on-site storm sewers and ditches, a stormwater management dry pond, and an oil/grit separator, discharging into an existing ditch/Foley Drain, located along the western property limits.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 24, 2024
to March 9, 2024