Cette consultation a eu lieu :
du 24 janvier 2024
au 9 mars 2024
Résumé de la proposition
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works to serve Southgate Renewables, located at 100 Eco Park Way in Southgate, Ontario.
Détails de l'emplacement
Adresse du site
100 Eco-Park Way
Southgate,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP
77 King Street West, Suite 3000
P.O. Box 95
Toronto,
ON
M5K 1G8
Canada
Détails de la proposition
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works to serve Southgate Renewables, located at 100 Eco Park Way in Southgate, Ontario.
The stormwater management works comprise of Stormwater Quality Control, Quantity Control, and Erosion Control works, and include on-site storm sewers and ditches, a stormwater management dry pond, and an oil/grit separator, discharging into an existing ditch/Foley Drain, located along the western property limits.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 24 janvier 2024
au 9 mars 2024