The Recycling Depot GP Inc. as general partner for and on behalf of The Recycling Depot LP - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-8142
Ministry reference number
9765-CY8HTU
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 16, 2024 - March 1, 2024 (45 days) Closed
Last updated

This consultation was open from:

January 16, 2024
to March 1, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from The Recycling Depot GP Inc. as a General Partner for and on behalf of the Recycling Depot LP, a waste processing facility located in the City of Barrie, Ontario.

Location details

Site address

529 Tiffin Street
Barrie, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

The Recycling Depot GP Inc. as general partner for and on behalf of The Recycling Depot LP
5090 Commerce Boulevard
Mississauga, ON
L4W 5M4
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from The Recycling Depot GP Inc. as a General Partner for and on behalf of the Recycling Depot LP, a waste processing facility located in the City of Barrie, Ontario.

The application includes all sources at the facility, including:

  • excess soil processing
  • vehicle traffic at the Site, and
  • loading/unloading operations

Emissions to the air from this facility include:

  • acetone
  • benzene
  • bromoform
  • chloroform
  • toluene, and
  • xylenes

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from January 16, 2024
to March 1, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice