Cette consultation a eu lieu :
du 16 janvier 2024
au 1 mars 2024
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from The Recycling Depot GP Inc. as a General Partner for and on behalf of the Recycling Depot LP, a waste processing facility located in the City of Barrie, Ontario.
Détails de l'emplacement
Adresse du site
529 Tiffin Street
Barrie,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
The Recycling Depot GP Inc. as general partner for and on behalf of The Recycling Depot LP
5090 Commerce Boulevard
Mississauga,
ON
L4W 5M4
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from The Recycling Depot GP Inc. as a General Partner for and on behalf of the Recycling Depot LP, a waste processing facility located in the City of Barrie, Ontario.
The application includes all sources at the facility, including:
- excess soil processing
- vehicle traffic at the Site, and
- loading/unloading operations
Emissions to the air from this facility include:
- acetone
- benzene
- bromoform
- chloroform
- toluene, and
- xylenes
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 16 janvier 2024
au 1 mars 2024