This consultation was open from:
January 5, 2024
to February 4, 2024
Proposal summary
This proposal is for a Renewal to Permit to Take Water No. 6305-C25R78 for Kirkland Lake Gold Ltd. Water will be taken from two sources: the East Lake (also known as Kitchin Lake) and the East Creek, for ore processing purposes in Unsurveyed Territory in the District of Cochrane, Ontario.
Location details
Site address
185 km from Cochrane via Highway 652
Unorganized Area, District of Cochrane
ON
Canada
Site location details
West of Sunday Lake Area
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Kirkland Lake Gold Ltd.
145 King Street East
Suite 400
Toronto,
ON
M5C 2Y7
Canada
Proposal details
This proposal is for a Renewal to Permit to Take Water No. 6305-C25R78 for Kirkland Lake Gold Ltd. Water will be taken from two sources: the East Lake (also known as Kitchin Lake) and the East Creek, for ore processing purposes in Unsurveyed Territory in the District of Cochrane, Ontario.
Permit type - Renewal (Category 1)
Source name: East Lake
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 1,250
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 1,800,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Source name: East Creek
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 29,650
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 42,696,000
- maximum number of days of taking in a year: 122
- earliest calendar date of taking (mm/dd): 03/01
- latest calendar date of taking (mm/dd): 06/30
- period of water taking: 10 years
Source name: East Creek
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 1,250
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 1,800,000
- maximum number of days of taking in a year: 243
- earliest calendar date of taking (mm/dd): 07/01
- latest calendar date of taking (mm/dd): 02/21
- period of Water Taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 5, 2024
to February 4, 2024