Cette consultation a eu lieu :
du 5 janvier 2024
au 4 février 2024
Résumé de la proposition
This proposal is for a Renewal to Permit to Take Water No. 6305-C25R78 for Kirkland Lake Gold Ltd. Water will be taken from two sources: the East Lake (also known as Kitchin Lake) and the East Creek, for ore processing purposes in Unsurveyed Territory in the District of Cochrane, Ontario.
Détails de l'emplacement
Adresse du site
185 km from Cochrane via Highway 652
Unorganized Area, District of Cochrane
ON
Canada
Détails de l'emplacement du site
West of Sunday Lake Area
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Kirkland Lake Gold Ltd.
145 King Street East
Suite 400
Toronto,
ON
M5C 2Y7
Canada
Détails de la proposition
This proposal is for a Renewal to Permit to Take Water No. 6305-C25R78 for Kirkland Lake Gold Ltd. Water will be taken from two sources: the East Lake (also known as Kitchin Lake) and the East Creek, for ore processing purposes in Unsurveyed Territory in the District of Cochrane, Ontario.
Permit type - Renewal (Category 1)
Source name: East Lake
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 1,250
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 1,800,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Source name: East Creek
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 29,650
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 42,696,000
- maximum number of days of taking in a year: 122
- earliest calendar date of taking (mm/dd): 03/01
- latest calendar date of taking (mm/dd): 06/30
- period of water taking: 10 years
Source name: East Creek
- purpose of water taking: industrial ore processing
- maximum rate (litres per minute): 1,250
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 1,800,000
- maximum number of days of taking in a year: 243
- earliest calendar date of taking (mm/dd): 07/01
- latest calendar date of taking (mm/dd): 02/21
- period of Water Taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 5 janvier 2024
au 4 février 2024