This consultation was open from:
October 10, 2023
to November 24, 2023
Decision summary
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Location details
Site address
470 Glendale Avenue
St. Catharines,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Hydro One Networks Inc
483 Bay Street
Toronto,
ON
M5G 2P5
Canada
Decision details
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
On January 25, 2024, Hydro One Networks Inc. requested to formally withdraw their application for an Environmental Compliance Approval.
The application is considered withdrawn and no approval was issued. The ministry closed the file on January 29, 2024.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
The proposal is for a new Environmental Compliance Approval for stormwater management works serving Hydro One Network’s Glendale Transmission Station, located at 470 Glendale Avenue in St. Catharines, Ontario.
The stormwater management works comprise of stormwater quality and quantity control, and include:
- the removal of four existing transformers and installation of two new transformers with associated spill containment pits
- an oil water separator
- catch basins and pipes
The stormwater management works will discharge to the existing storm sewer located along Glendale Avenue.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from October 10, 2023
to November 24, 2023
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0