Cette consultation a eu lieu :
du 10 octobre 2023
au 24 novembre 2023
Résumé de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
470 Glendale Avenue
St. Catharines,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Hydro One Networks Inc
483 Bay Street
Toronto,
ON
M5G 2P5
Canada
Détails de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
On January 25, 2024, Hydro One Networks Inc. requested to formally withdraw their application for an Environmental Compliance Approval.
The application is considered withdrawn and no approval was issued. The ministry closed the file on January 29, 2024.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
The proposal is for a new Environmental Compliance Approval for stormwater management works serving Hydro One Network’s Glendale Transmission Station, located at 470 Glendale Avenue in St. Catharines, Ontario.
The stormwater management works comprise of stormwater quality and quantity control, and include:
- the removal of four existing transformers and installation of two new transformers with associated spill containment pits
- an oil water separator
- catch basins and pipes
The stormwater management works will discharge to the existing storm sewer located along Glendale Avenue.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 10 octobre 2023
au 24 novembre 2023
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0