Decision summary
Glencore Canada Corporation requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Location details
Site address
2 Longyear Drive
Greater Sudbury,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Glencore Canada Corporation
2 Longyear Drive
Greater Sudbury,
ON
P0M 1S0
Canada
Decision details
On April 28, 2023, Glencore Canada Corporation requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued. The ministry closed the file on May 2, 2023.
Effects of consultation
The comments received had no impact on the decision as the application was withdrawn by the proponent.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 7530-93ZKPV for Glencore Canada Corporation, a nickel-copper smelting facility located in the Sudbury, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- concentrate slurry feed preparation
- roasting operation
- the sulfuric acid plant
- electric furnace operation
- converter operation
- matte granulating/crushing operations
- custom feed preparation
- calciner operations
- all other equipment and ancillary and support processes and activities
Emissions to the air from this facility include:
- hydrogen sulfide
- hydrogen chloride
- total particulate
- iron
- lead
- nickel
- nitrogen oxides
- sulfur dioxide
- other products of combustion
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from February 18, 2022
to April 4, 2022
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
1By email
0By mail
0