Cette consultation a eu lieu :
du 18 février 2022
au 4 avril 2022
Résumé de la décision
Glencore Canada Corporation requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
2 Longyear Drive
Greater Sudbury,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Glencore Canada Corporation
2 Longyear Drive
Greater Sudbury,
ON
P0M 1S0
Canada
Détails de la décision
On April 28, 2023, Glencore Canada Corporation requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued. The ministry closed the file on May 2, 2023.
Effets de la consultation
The comments received had no impact on the decision as the application was withdrawn by the proponent.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 7530-93ZKPV for Glencore Canada Corporation, a nickel-copper smelting facility located in the Sudbury, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- concentrate slurry feed preparation
- roasting operation
- the sulfuric acid plant
- electric furnace operation
- converter operation
- matte granulating/crushing operations
- custom feed preparation
- calciner operations
- all other equipment and ancillary and support processes and activities
Emissions to the air from this facility include:
- hydrogen sulfide
- hydrogen chloride
- total particulate
- iron
- lead
- nickel
- nitrogen oxides
- sulfur dioxide
- other products of combustion
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 18 février 2022
au 4 avril 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0