This consultation was open from:
November 18, 2021
to January 2, 2022
Decision summary
GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Location details
Site address
2045 Continental Avenue
Windsor ,
ON
N9E 3P2
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
GFL Infrastructure Group Inc.
100 New Park Place, Suite 500
Vaughan,
ON
L4K 0H9
Canada
Decision details
GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
GFL Infrastructure Group Inc. wanted to modify their proposed stormwater management works to serve the transfer station site located at 2045 Continental Avenue in the City of Windsor.
The ministry could not complete its review of their application for an Environmental Compliance Approval without the updated stormwater management works design report.
The ministry closed the file on October 31, 2022.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Since no decision was made, there is no decision to appeal.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (industrial sewage) for GFL Infrastructure Group (GFL). This proposal is for the collection, transmission and disposal of stormwater runoff at GFL’s waste management site located at 2045 Continental Avenue, City of Windsor, County of Essex, Ontario.
Stormwater from the site is collected in on-site catchbasins with orifice controls and directed to a proposed oil/grit separator and discharged with a direct connection to the municipal sewer system along Continental Avenue, and ultimately to the Detroit River.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from November 18, 2021
to January 2, 2022
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0