Cette consultation a eu lieu :
du 18 novembre 2021
au 2 janvier 2022
Résumé de la décision
GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
2045 Continental Avenue
Windsor ,
ON
N9E 3P2
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
GFL Infrastructure Group Inc.
100 New Park Place, Suite 500
Vaughan,
ON
L4K 0H9
Canada
Détails de la décision
GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
GFL Infrastructure Group Inc. wanted to modify their proposed stormwater management works to serve the transfer station site located at 2045 Continental Avenue in the City of Windsor.
The ministry could not complete its review of their application for an Environmental Compliance Approval without the updated stormwater management works design report.
The ministry closed the file on October 31, 2022.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Since no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (industrial sewage) for GFL Infrastructure Group (GFL). This proposal is for the collection, transmission and disposal of stormwater runoff at GFL’s waste management site located at 2045 Continental Avenue, City of Windsor, County of Essex, Ontario.
Stormwater from the site is collected in on-site catchbasins with orifice controls and directed to a proposed oil/grit separator and discharged with a direct connection to the municipal sewer system along Continental Avenue, and ultimately to the Detroit River.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 18 novembre 2021
au 2 janvier 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0