This consultation was open from:
October 25, 2021
to December 9, 2021
Decision summary
Lagoon Tent and Trailer Park Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Location details
Site address
100 Lagoon Trailer Park Drive
Huntsville ,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Lagoon Tent and Trailer Park Inc.
100 Lagoon Trailer Park Drive
Huntsville,
ON
P1H 2J4
Canada
Decision details
Lagoon Tent and Trailer Park Inc. requested to withdraw their application for an Environmental Compliance Approval due to the changes in ownership as well as the design of proposed sewage works.
The application is considered withdrawn and no approval was issued. The ministry closed the file on February 16, 2022.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing subsurface disposal works at Lagoon Tent and Trailer Park, located at 100 Lagoon Trailer Park Drive in the Municipality of Huntsville, District of Muskoka, Ontario.
The park has a total of:
- 70 trailer sites and 51 tenting sites
- 3 rental cottages
- a retail store and park office
- 4 year-round residential dwellings.
The daily design sanitary sewage flow is approximately 43,403 litres per day.
The proposed modifications to the existing sewage works consist of two new sewage systems:
- one with two collection system pump chambers, a sewage dump station for travel trailers, one 43,500 litres single chamber septic tank and one 30,000 litres single chamber septic tank, a leaching bed dosing chamber and a Class 4 subsurface disposal bed with a 24,375 litres per day capacity
- the second sewage system consists of an existing sewage dump station for travel trailers, one 43,500 litres single chamber septic tank and one 22,000 litres single chamber septic tank, a leaching bed dosing chamber and a Class 4 subsurface disposal bed with a 17,050 litres per day capacity
These proposed works will service:
- the 70 trailer sites
- 51 tenting sites
- 3 rental cottages located at the park,
The existing sewage works will service:
- the retail store
- park office
- 4 year-round residential dwellings
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from October 25, 2021
to December 9, 2021
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0