Cette consultation a eu lieu :
du 25 octobre 2021
au 9 décembre 2021
Résumé de la décision
Lagoon Tent and Trailer Park Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
100 Lagoon Trailer Park Drive
Huntsville ,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Lagoon Tent and Trailer Park Inc.
100 Lagoon Trailer Park Drive
Huntsville,
ON
P1H 2J4
Canada
Détails de la décision
Lagoon Tent and Trailer Park Inc. requested to withdraw their application for an Environmental Compliance Approval due to the changes in ownership as well as the design of proposed sewage works.
The application is considered withdrawn and no approval was issued. The ministry closed the file on February 16, 2022.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for modifications to existing subsurface disposal works at Lagoon Tent and Trailer Park, located at 100 Lagoon Trailer Park Drive in the Municipality of Huntsville, District of Muskoka, Ontario.
The park has a total of:
- 70 trailer sites and 51 tenting sites
- 3 rental cottages
- a retail store and park office
- 4 year-round residential dwellings.
The daily design sanitary sewage flow is approximately 43,403 litres per day.
The proposed modifications to the existing sewage works consist of two new sewage systems:
- one with two collection system pump chambers, a sewage dump station for travel trailers, one 43,500 litres single chamber septic tank and one 30,000 litres single chamber septic tank, a leaching bed dosing chamber and a Class 4 subsurface disposal bed with a 24,375 litres per day capacity
- the second sewage system consists of an existing sewage dump station for travel trailers, one 43,500 litres single chamber septic tank and one 22,000 litres single chamber septic tank, a leaching bed dosing chamber and a Class 4 subsurface disposal bed with a 17,050 litres per day capacity
These proposed works will service:
- the 70 trailer sites
- 51 tenting sites
- 3 rental cottages located at the park,
The existing sewage works will service:
- the retail store
- park office
- 4 year-round residential dwellings
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 25 octobre 2021
au 9 décembre 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0