This consultation was open from:
August 17, 2021
to September 16, 2021
Decision summary
Approval was granted to allow Mann Construction Group Ltd. to increase the allowable maximum annual tonnage that can be removed from the site, operating in the Township of Centre Wellington.
Location details
Site location details
Township of Centre Wellington, Wellington County.
Part Lot 9, Concession 6, Geographic Township of Pilkington.
The site is located approximately 7 kilometres east of the Community of Elora.
The site is authorized under Aggregate Resources Act (ARA) Licence No. 5595.
A link to our mapping tool allows you to locate and view licensed sites under the ARA.
Proponent(s)
Mann Construction Group Ltd.
7367 Wellington Road 30
Guelph,
ON
N1H 6J2
Canada
Decision details
A change to Aggregate Resources Act (ARA) licence No. 5595 was approved by the Regional Director on November 19, 2021.
The licence was amended authorizing an increase in the number of tonnes of aggregate to be removed in a calendar year. The annual tonnage condition was increased from 100,000 tonnes to 300,000 tonnes annually.
Effects of consultation
One (1) comment was received in response to the Environmental Registry of Ontario notice. The same comment was received in response to the ARA consultation process.
The comment was related to questions regarding water monitoring and operations on site. The applicant worked to address the questions by providing additional information about the site plans and water monitoring on site.
Two additional comments were received through the ARA consultation process which stated no concerns with the proposal.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor South tower
Peterborough,
ON
K9J 3C7
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Seana Richardson
300 Water Street, 4th Floor South tower
Peterborough,
ON
K9J 3C7
Canada
Original proposal
Proposal details
Mann Construction Group Ltd. has applied to allow an increase in the number of tonnes of aggregate that may be removed in a calendar year. The current licence allows for the removal of a maximum of 100,000 tonnes of material annually. Mann Construction Group Ltd. has requested that the tonnage limit be increased to 300,000 tonnes annually.
This increase has been requested by the licensee to address the higher demand for aggregates in the area.
Other information
Mann Construction Limited operates the licenced site under the authority of Aggregate Resources Act licence No. 5595. In total, 40.2 hectares are currently licenced as a pit.
Public consultation opportunities
The proposal request for this licence is being circulated within the Ministry of Northern Development, Mines, Natural Resources and Forestry. Additionally, notification of this application has been forwarded to the Township of Centre Wellington and Wellington County, for comment.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor South tower
Peterborough,
ON
K9J 3C7
Canada
Comment
Commenting is now closed.
This consultation was open from August 17, 2021
to September 16, 2021
Connect with us
Contact
Seana Richardson
300 Water Street, 4th Floor South tower
Peterborough,
ON
K9J 3C7
Canada
Comments received
Through the registry
0By email
0By mail
0