This consultation was open from:
August 19, 2019
to September 18, 2019
Decision summary
This application was closed and returned on August 5, 2020. The proponent has indicated that they have completed an Environmental Activity and Sector Registry (EASR) for the construction dewatering and that a Permit to Take Water is no longer required.
Location details
Site address
12785 Ninth Line
Lot 4, Concession 9
Whitchurch-Stouffville,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Savena Cove Homes Inc.
8600 Dufferin Street
Vaughan,
ON
L4K 5P5
Canada
Decision details
Savena Cove Homes Inc. has completed an Environmental Activity and Sector Registry (EASR) for the construction dewatering activities and a Permit to Take Water is no longer required.The Ministry decided to close the file and return the application for Permit To Take Water for construction dewatering at the above noted site according to a request by the consultant in an email dated July 30, 2020.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
How to Appeal
Appeals are not allowed
The application was withdrawn and no Permit to Take Water was issued.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Permit to Take Water for construction dewatering associated with a proposed residential development. The water takings details will be as follows:
Source 1: servicing
- source of water - sandpoint well
- purpose of taking: construction dewatering
- period of water taking: January 1 to December 31
- maximum rate per minute (litres): 217
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 312,000
- maximum number of days of taking per year: 365
- length of time: 2 years
Source 2: stormwater management pond
- source of water - sandpoint well
- purpose of taking: construction dewatering
- period of water taking: January 1 to December 31
- maximum rate per minute (litres): 494
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 711,000
- maximum number of days of taking per year: 365
- length of time: 2 years
More about Permits to Take Water
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Comment
Commenting is now closed.
This consultation was open from August 19, 2019
to September 18, 2019
Connect with us
Contact
Permit to take water coordinator (Central region)
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Comments received
Through the registry
0By email
0By mail
0