This application was closed and returned on August 5, 2020. The proponent has indicated that they have completed an Environmental Activity and Sector Registry (EASR) for the construction dewatering and that a Permit to Take Water is no longer required.
Détails de l'emplacement
Adresse du site
12785 Ninth Line
Lot 4, Concession 9
Whitchurch-Stouffville,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Savena Cove Homes Inc.
8600 Dufferin Street
Vaughan,
ON
L4K 5P5
Canada
Détails de la décision
Savena Cove Homes Inc. has completed an Environmental Activity and Sector Registry (EASR) for the construction dewatering activities and a Permit to Take Water is no longer required.The Ministry decided to close the file and return the application for Permit To Take Water for construction dewatering at the above noted site according to a request by the consultant in an email dated July 30, 2020.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
How to Appeal
Appeals are not allowed
The application was withdrawn and no Permit to Take Water was issued.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Permit to Take Water for construction dewatering associated with a proposed residential development. The water takings details will be as follows:
Source 1: servicing
- source of water - sandpoint well
- purpose of taking: construction dewatering
- period of water taking: January 1 to December 31
- maximum rate per minute (litres): 217
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 312,000
- maximum number of days of taking per year: 365
- length of time: 2 years
Source 2: stormwater management pond
- source of water - sandpoint well
- purpose of taking: construction dewatering
- period of water taking: January 1 to December 31
- maximum rate per minute (litres): 494
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 711,000
- maximum number of days of taking per year: 365
- length of time: 2 years
More about Permits to Take Water
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 19 août 2019
au 18 septembre 2019
Communiquer avec nous
Contact
Permit to take water coordinator (Central region)
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0