Johnston Bros. (Bothwell) Limited - Changes to the site plan for a pit or quarry

Instrument type: Changes to the site plan for a pit or quarry

ERO number
019-0402
Ministry reference number
MNRF INST 43/19
Notice type
Instrument
Act
Aggregate Resources Act, R.S.O. 1990
Posted by
Ministry of Northern Development, Mines, Natural Resources and Forestry
Transferred to
Ministry of Natural Resources and Forestry
Notice stage
Decision
Decision posted
Comment period
August 6, 2019 - September 20, 2019 (45 days) Closed
Last updated

This consultation was open from:
August 6, 2019
to September 20, 2019

Decision summary

Site plan amendment for Johnston Brothers (Bothwell) Limited to change the final depth of extraction from above the water table to below the water table was approved. Changes to the final rehabilitation of the site operating in the Municipality of Thames Centre, County of Middlesex was also approved.

Location details

Site location details

Part Lot 16, Concession 4, Geographic Township of North Dorchester, Municipality of Thames Centre, County of Middlesex.

The site is located on the south side of Marion Street between Elgin and Hunt Roads, approximately 3 km Northeast of Dorchester.

The site is identified as Aggregate Resources Act (ARA) licence #608781.

A link to our mapping tool allows you to locate and view licensed site under the ARA.

Proponent(s)

Johnston Bros. (Bothwell) Limited
212220 Johnston Line,
R.R. #1
Wardsville, ON
N0L 2N0
Canada

Decision details

A change to the site plan for ARA Licence No. 608781 was approved by the Regional Director on August 17, 2022.

The approval allows Johnston Brothers (Bothwell) Limited to change the final depth of extraction from above the water table to below the water table and to change the final rehabilitation of the site from agricultural usage to include a 10.15 hectare pond. The depth of extraction on-site will change from 270 metres above sea level (masl) to 264 masl.

Comments received

Through the registry

0

By email

0

By mail

1
View comments submitted through the registry

Effects of consultation

No comments were received in response to the Environmental Registry of Ontario notice.

One (1) comment was received in response to the ARA consultation process. The main concerns were related to the ground water table and thermal impacts. Through providing additional information and making changes to the site plan, the applicant was able to address the concerns raised.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

MNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street
4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada

How to Appeal

Appeals are not allowed

This instrument type cannot be appealed. Learn more about our consultation process.

Connect with us

Contact

Jason McLay

Phone number
Email address
Office
MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-0402
Ministry reference number
MNRF INST 43/19
Notice type
Instrument
Act
Aggregate Resources Act, R.S.O. 1990
Posted by
Ministry of Natural Resources and Forestry
Proposal posted

Comment period

August 6, 2019 - September 20, 2019 (45 days)

Proposal details

Proposal updates

This notice was updated on September 28, 2021 to advise the public that there has been no change to the status of the proposal and it is still being considered. No additional opportunity for comment is being provided for at this time.

Proposal information

Application has been made by Johnston Bros. (Bothwell) Limited to amend their site plan for the above noted licensed site to change the final depth of extraction from above the water table to below the water table. The depth of extraction onsite will change from 270 metres above sea level (masl) to 264 masl The final rehabilitation of the site is proposed to change from agricultural to a 10.15-hectare pond surrounded by agricultural use.

Other information

Johnston Bros. (Bothwell) Limited operates this site under the authority of Licence #608781 under the Aggregate Resources Act. Extraction is presently allowed above the water table only. In total 18.5 hectares are currently licenced as a pit. The annual tonnage condition is 250,000 tonnes.

For this proposal, the following are available for viewing at the Ministry of Natural Resources and Forestry office listed below:

  • Revised Site plan
  • Hydrogeological report (Level 1 and 2)

The Site Plan addresses existing features of the pit and/or quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.

A Hydrogeological Level 1 report is a preliminary evaluation to determine the final extraction depth relative to the established groundwater table(s) and the potential for adverse effects to groundwater and surface water resources and their uses. If the Level 1 report identifies a potential adverse effect resulting from the operation, then an impact assessment (Level 2 report) is required to determine the significance of the effect and the feasibility of mitigation.

Other public consultation

As specified in the Aggregate Resources Act, written notice concerning this application was delivered to landowners within 120 metres of the proposed licenced boundary; an information sign giving notice to the public of this proposed amendment was erected at the site. A Notice of Proposed Site Plan Amendment appeared in the Dorchester Signpost on July 17, 2019. A Public Information Session will be held August 8, 2019 between the hours of 10 am to 12 pm at the Flight Exec Centre, 2066 Dorchester Road, Dorchester, Ontario.

The proposal request for this licence is being circulated within the Ministry of Natural Resources and Forestry Aylmer District office. Additionally, notification of this application has been forwarded to the Municipality of Thames Centre, County of Middlesex, the Upper Thames River Conservation Authority, the Ministry of Agriculture Food and Rural Affairs, and the Ministry of Environment, Conservation and Parks for comment.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

Comment

Commenting is now closed.

This consultation was open from August 6, 2019
to September 20, 2019

Connect with us

Contact

Derek Seim

Phone number
Email address
Office
MNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street
4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada