Johnston Bros. (Bothwell) Limited - Changes to the site plan for a pit or quarry

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Changes to the site plan for a pit or quarry

Numéro du REO
019-0402
Numéro de référence du ministère
MNRF INST 43/19
Type d'avis
Instrument
Loi
Aggregate Resources Act, R.S.O. 1990
Affiché par
Ministry of Northern Development, Mines, Natural Resources and Forestry
Étape de l'avis
Ministry of Natural Resources and Forestry
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 6 août 2019 au 20 septembre 2019 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 6 août 2019
au 20 septembre 2019

Résumé de la décision

Site plan amendment for Johnston Brothers (Bothwell) Limited to change the final depth of extraction from above the water table to below the water table was approved. Changes to the final rehabilitation of the site operating in the Municipality of Thames Centre, County of Middlesex was also approved.

Détails de l'emplacement

Détails de l'emplacement du site

Part Lot 16, Concession 4, Geographic Township of North Dorchester, Municipality of Thames Centre, County of Middlesex.

The site is located on the south side of Marion Street between Elgin and Hunt Roads, approximately 3 km Northeast of Dorchester.

The site is identified as Aggregate Resources Act (ARA) licence #608781.

A link to our mapping tool allows you to locate and view licensed site under the ARA.

Promoteur(s)

Johnston Bros. (Bothwell) Limited
212220 Johnston Line,
R.R. #1
Wardsville, ON
N0L 2N0
Canada

Détails de la décision

A change to the site plan for ARA Licence No. 608781 was approved by the Regional Director on August 17, 2022.

The approval allows Johnston Brothers (Bothwell) Limited to change the final depth of extraction from above the water table to below the water table and to change the final rehabilitation of the site from agricultural usage to include a 10.15 hectare pond. The depth of extraction on-site will change from 270 metres above sea level (masl) to 264 masl.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

1
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received in response to the Environmental Registry of Ontario notice.

One (1) comment was received in response to the ARA consultation process. The main concerns were related to the ground water table and thermal impacts. Through providing additional information and making changes to the site plan, the applicant was able to address the concerns raised.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street
4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada

How to Appeal

Les appels ne sont pas autorisés

Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.

Communiquer avec nous

Contact

Jason McLay

Phone number
Email address
Office
MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-0402
Numéro de référence du ministère
MNRF INST 43/19
Type d'avis
Instrument
Loi
Aggregate Resources Act, R.S.O. 1990
Affiché par
Ministry of Natural Resources and Forestry
Proposition affichée

Période de consultation

6 août 2019 - 20 septembre 2019 (45 days)

Détails de la proposition

Proposal updates

This notice was updated on September 28, 2021 to advise the public that there has been no change to the status of the proposal and it is still being considered. No additional opportunity for comment is being provided for at this time.

Proposal information

Application has been made by Johnston Bros. (Bothwell) Limited to amend their site plan for the above noted licensed site to change the final depth of extraction from above the water table to below the water table. The depth of extraction onsite will change from 270 metres above sea level (masl) to 264 masl The final rehabilitation of the site is proposed to change from agricultural to a 10.15-hectare pond surrounded by agricultural use.

Other information

Johnston Bros. (Bothwell) Limited operates this site under the authority of Licence #608781 under the Aggregate Resources Act. Extraction is presently allowed above the water table only. In total 18.5 hectares are currently licenced as a pit. The annual tonnage condition is 250,000 tonnes.

For this proposal, the following are available for viewing at the Ministry of Natural Resources and Forestry office listed below:

  • Revised Site plan
  • Hydrogeological report (Level 1 and 2)

The Site Plan addresses existing features of the pit and/or quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.

A Hydrogeological Level 1 report is a preliminary evaluation to determine the final extraction depth relative to the established groundwater table(s) and the potential for adverse effects to groundwater and surface water resources and their uses. If the Level 1 report identifies a potential adverse effect resulting from the operation, then an impact assessment (Level 2 report) is required to determine the significance of the effect and the feasibility of mitigation.

Other public consultation

As specified in the Aggregate Resources Act, written notice concerning this application was delivered to landowners within 120 metres of the proposed licenced boundary; an information sign giving notice to the public of this proposed amendment was erected at the site. A Notice of Proposed Site Plan Amendment appeared in the Dorchester Signpost on July 17, 2019. A Public Information Session will be held August 8, 2019 between the hours of 10 am to 12 pm at the Flight Exec Centre, 2066 Dorchester Road, Dorchester, Ontario.

The proposal request for this licence is being circulated within the Ministry of Natural Resources and Forestry Aylmer District office. Additionally, notification of this application has been forwarded to the Municipality of Thames Centre, County of Middlesex, the Upper Thames River Conservation Authority, the Ministry of Agriculture Food and Rural Affairs, and the Ministry of Environment, Conservation and Parks for comment.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 6 août 2019
au 20 septembre 2019

Communiquer avec nous

Contact

Derek Seim

Phone number
Email address
Office
MNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street
4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada