Extender Minerals of Canada Limited - Amendment to a closure plan by order

Instrument type: Amendment to a closure plan by order

ERO number
013-5010
Ministry reference number
MG-2018-003
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Mines
Notice stage
Decision
Decision posted
Comment period
April 2, 2019 - May 2, 2019 (30 days) Closed
Last updated

This consultation was open from:
April 2, 2019
to May 2, 2019

Decision summary

The order was issued.  

Location details

Site location details

The North Williams Mine is located 35 km southeast of Shining Tree at UTM Coordinates Zone 17 498204E 5251418N in the Territorial District of Timiskaming, Larder Lake Mining Division. Access to the North Williams mine is via the Sandy Lake forest access road off Highway 560. Turn off Highway 560 onto the Sandy Lake forest access road approximately 1 km east of the Lower Opikinimika Lake bridge. Travel east on the Sandy Lake Road for approximately 17.3 km then turn south on the Tracey Lake Road and travel approximately 15.1 km south to the entrance of the mine site.

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Extender Minerals of Canada Limited
106 Princess Margaret Boulevard
North Williams Township
Islington, ON
M9B 2Z3
Canada

Decision details

Order was issued to file a Closure Plan Amendment as the site did not reflect the current filed closure plan. 

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received and therefore did not impact the decision to issue the order. 

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

How to Appeal

Appeals are not allowed

Connect with us

Contact

Sarah Momy

Phone number
Email address
Office
Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
013-5010
Ministry reference number
MG-2018-003
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Proposal posted

Comment period

April 2, 2019 - May 2, 2019 (30 days)

Proposal details

Description of instrument

A Director’s Order will be issued to Extender Minerals of Canada Limited, Robert Hill, requiring the proponent to file within a certain date, an amendment to the certified mine closure plan with the ENDM as required under S. 143(2) of the Mining Act. The proponent is required to have a certified mine closure plan for the mine hazards on site. This closure plan amendment will propose rehabilitation measures to be implemented at the Mine site.

The North Williams Mine site is a inactive barite mine. The proposed rehabilitation work will include description of work to be completed.

The following are some of the major components of this closure plan that need to be addressed by the proponent:

  • The current state of the crown pillar stability is unknown 
  • There is no financial assurance for the removal and disposal of pipelines
  • There is no financial assurance for the removal and disposal of waterlines
  • There is no financial assurance for the removal and disposal of storage tanks
  • There is no financial assurance for the removal of remaining petroleum products
  • There is no financial assurance for the removal of any chemicals
  • There is no financial assurance for the removal of waste
  • There is no financial assurance for the removal of explosives
  • There is no financial assurance for the testing, clean-up and disposal of contaminated soils
  • There is no financial assurance for the pumping and removal of the septic tank(s)

Specific mine hazards at this site include:

  • one vent raise
  • one portal
  • open cut
  • crown pillar
  • two mine water settling ponds
  • waste rock areas
  • equipment, storage tanks, petroleum products, pipelines, waterlines, chemicals, waste, explosives, septic tank(s)
  • contaminated soils

The required closure plan amendment with accompanying financial assurance will be submitted in a form and manner in accordance with Ontario Regulation 240/00, including the Mine Rehabilitation Code of Ontario.

Other information

This notice is for your information and comment. The Environmental Bill of Rights requires this notice to be placed on the Environmental Registry.

This is a 30-day Notice required prior to the issuance of a Director’s Order; this Order will require the proponent to file an amendment to a certified closure plan.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from April 2, 2019
to May 2, 2019

Connect with us

Contact

Sarah Momy

Phone number
Email address
Office
Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number