Extender Minerals of Canada Limited - Amendment to a closure plan by order

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Amendment to a closure plan by order

Numéro du REO
013-5010
Numéro de référence du ministère
MG-2018-003
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Mines
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 2 avril 2019 au 2 mai 2019 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 2 avril 2019
au 2 mai 2019

Résumé de la décision

The order was issued.  

Détails de l'emplacement

Détails de l'emplacement du site

The North Williams Mine is located 35 km southeast of Shining Tree at UTM Coordinates Zone 17 498204E 5251418N in the Territorial District of Timiskaming, Larder Lake Mining Division. Access to the North Williams mine is via the Sandy Lake forest access road off Highway 560. Turn off Highway 560 onto the Sandy Lake forest access road approximately 1 km east of the Lower Opikinimika Lake bridge. Travel east on the Sandy Lake Road for approximately 17.3 km then turn south on the Tracey Lake Road and travel approximately 15.1 km south to the entrance of the mine site.

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Extender Minerals of Canada Limited
106 Princess Margaret Boulevard
North Williams Township
Islington, ON
M9B 2Z3
Canada

Détails de la décision

Order was issued to file a Closure Plan Amendment as the site did not reflect the current filed closure plan. 

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received and therefore did not impact the decision to issue the order. 

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

How to Appeal

Appeals are not allowed

Communiquer avec nous

Contact

Sarah Momy

Phone number
Email address
Office
Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
013-5010
Numéro de référence du ministère
MG-2018-003
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Energy, Northern Development and Mines
Proposition affichée

Période de consultation

2 avril 2019 - 2 mai 2019 (30 days)

Détails de la proposition

Description of instrument

A Director’s Order will be issued to Extender Minerals of Canada Limited, Robert Hill, requiring the proponent to file within a certain date, an amendment to the certified mine closure plan with the ENDM as required under S. 143(2) of the Mining Act. The proponent is required to have a certified mine closure plan for the mine hazards on site. This closure plan amendment will propose rehabilitation measures to be implemented at the Mine site.

The North Williams Mine site is a inactive barite mine. The proposed rehabilitation work will include description of work to be completed.

The following are some of the major components of this closure plan that need to be addressed by the proponent:

  • The current state of the crown pillar stability is unknown 
  • There is no financial assurance for the removal and disposal of pipelines
  • There is no financial assurance for the removal and disposal of waterlines
  • There is no financial assurance for the removal and disposal of storage tanks
  • There is no financial assurance for the removal of remaining petroleum products
  • There is no financial assurance for the removal of any chemicals
  • There is no financial assurance for the removal of waste
  • There is no financial assurance for the removal of explosives
  • There is no financial assurance for the testing, clean-up and disposal of contaminated soils
  • There is no financial assurance for the pumping and removal of the septic tank(s)

Specific mine hazards at this site include:

  • one vent raise
  • one portal
  • open cut
  • crown pillar
  • two mine water settling ponds
  • waste rock areas
  • equipment, storage tanks, petroleum products, pipelines, waterlines, chemicals, waste, explosives, septic tank(s)
  • contaminated soils

The required closure plan amendment with accompanying financial assurance will be submitted in a form and manner in accordance with Ontario Regulation 240/00, including the Mine Rehabilitation Code of Ontario.

Other information

This notice is for your information and comment. The Environmental Bill of Rights requires this notice to be placed on the Environmental Registry.

This is a 30-day Notice required prior to the issuance of a Director’s Order; this Order will require the proponent to file an amendment to a certified closure plan.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 2 avril 2019
au 2 mai 2019

Communiquer avec nous

Contact

Sarah Momy

Phone number
Email address
Office
Mine Rehabilitation and Compliance Section - Timmins Office
Address

5520 - 101 Highway East
P.O. Bag 3060
South Porcupine, ON
P0N 1H0
Canada

Office phone number