John Hedican Enterprises/EnviroClean - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
013-3101
Ministry reference number
18-THU-55377
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
June 18, 2018 - August 2, 2018 (45 days) Closed
Last updated

This consultation was open from:
June 18, 2018
to August 2, 2018

Decision summary

The application for an Environmental Compliance Approval (Waste Site)18-THU-55377 for a hauled sewage site was withdrawn by the proponent. No approval was issued. 

Location details

Site location details

Lake Helen
Corrigal Township
District of Thunder Bay

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

John Hedican Enterprises/EnviroClean
145 McKirdy Avenue
Nipigon, ON
P0T 2J0
Canada

Decision details

The application was withdrawn by the proponent. No approval was issued and the ministry closed the file on 09/19/2018.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Northern Region Office
Address

435 James Street South
Floor 3, Suite 331
Thunder Bay, ON
P7E 6S7
Canada

Office phone number
Thunder Bay District Office
Address

435 James Street South
Floor 3, Suite 331B
Thunder Bay, ON
P7E 6S7
Canada

Office phone number

How to Appeal

Appeals are not allowed

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
013-3101
Ministry reference number
18-THU-55377
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

June 18, 2018 - August 2, 2018 (45 days)

Proposal details

Description of instrument

Hauled Sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).

This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.

Other information

Site details

Application Type: New
Total Useable Area: 8 hectares
Type of Disposal: Dewatering Trench

Highlights of proposed approval requirements

Prior to operating at the Site, the Company shall develop written procedures covering the following:

  • procedures for reporting to the Ministry, and municipal authorities as required in the event a spill occurs at the Site
  • a list of the personnel responsible for operations at the Site

The Company shall ensure that all personnel involved in the operation of this Hauled Sewage Disposal Site are aware of the requirements of this Approval and are trained in Spill Prevention.

Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the Company shall take appropriate remedial action to limit the impact. The Company must ensure that no unnecessary off-Site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this Site.

Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received.

The 3 dewatering trenches must be designed and constructed according to specified standards set out in the approval.
The dewatering trenches must be operated in accordance with specified standards set out in the approval which include maximum volumes that can be put in a trench, rotating the use of the trenches, ensuring trenches have a rest period and cleaning residuals from the trenches on a regular basis.

A closure plan shall be developed for the site and the site must be closed in accordance with the plan.

Financial Assurance will not be required.

Other

Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, Ministry of Natural Resources and Forestry and Ministry of Agriculture, Food and Rural Affairs have been acquired.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Northern Region Office
Address

435 James Street South
Floor 3, Suite 331
Thunder Bay, ON
P7E 6S7
Canada

Office phone number
Thunder Bay District Office
Address

435 James Street South
Floor 3, Suite 331B
Thunder Bay, ON
P7E 6S7
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from June 18, 2018
to August 2, 2018

Connect with us

Contact