Cette consultation a eu lieu :
du 18 juin 2018
au 2 août 2018
Résumé de la décision
The application for an Environmental Compliance Approval (Waste Site)18-THU-55377 for a hauled sewage site was withdrawn by the proponent. No approval was issued.
Détails de l'emplacement
Détails de l'emplacement du site
Lake Helen
Corrigal Township
District of Thunder Bay
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
John Hedican Enterprises/EnviroClean
145 McKirdy Avenue
Nipigon,
ON
P0T 2J0
Canada
Détails de la décision
The application was withdrawn by the proponent. No approval was issued and the ministry closed the file on 09/19/2018.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
435 James Street South
Floor 3, Suite 331B
Thunder Bay,
ON
P7E 6S7
Canada
How to Appeal
Appeals are not allowed
Communiquer avec nous
Contact
Michelle Heyens
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Proposition initiale
Détails de la proposition
Description of instrument
Hauled Sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).
This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.
Other information
Site details
Application Type: New
Total Useable Area: 8 hectares
Type of Disposal: Dewatering Trench
Highlights of proposed approval requirements
Prior to operating at the Site, the Company shall develop written procedures covering the following:
- procedures for reporting to the Ministry, and municipal authorities as required in the event a spill occurs at the Site
- a list of the personnel responsible for operations at the Site
The Company shall ensure that all personnel involved in the operation of this Hauled Sewage Disposal Site are aware of the requirements of this Approval and are trained in Spill Prevention.
Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the Company shall take appropriate remedial action to limit the impact. The Company must ensure that no unnecessary off-Site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this Site.
Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received.
The 3 dewatering trenches must be designed and constructed according to specified standards set out in the approval.
The dewatering trenches must be operated in accordance with specified standards set out in the approval which include maximum volumes that can be put in a trench, rotating the use of the trenches, ensuring trenches have a rest period and cleaning residuals from the trenches on a regular basis.
A closure plan shall be developed for the site and the site must be closed in accordance with the plan.
Financial Assurance will not be required.
Other
Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, Ministry of Natural Resources and Forestry and Ministry of Agriculture, Food and Rural Affairs have been acquired.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
435 James Street South
Floor 3, Suite 331B
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 18 juin 2018
au 2 août 2018
Communiquer avec nous
Contact
Michelle Heyens
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0