Sun Circle Greenhouses requested to withdraw the proposal for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility located at 725 Road 2 East, Kingsville, County of Essex.
Location details
Site location details
725 Road 2 East
Kingsville
County of Essex
N9Y 2E7
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Sun Circle Greenhouses Incorporated
725 Road 2 Road East
Kingsville,
ON
N9Y 2E7
Canada
Decision details
In response to Sun Circle Greenhouses' request to withdraw its proposal the ministry cancelled and closed the file on August 9, 2018.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
How to Appeal
Appeals are not allowed
The client requested the application be withdrawn, and the ministry closed the file.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
Description of instrument
This proposal is for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility serving Sun Circle Greenhouses Inc., located at 725 Road 2 East, Kingsville, County of Essex.
The existing stormwater structure includes a roof water drainage pipe system, wet pond, an emergency spillway, outlet pipe and an oil and grit separator, and will discharge to the Scratch Wigle Drain.
Other information
Environmental Compliance Approvals (ECAs) for greenhouse stormwater management facilities follow a streamlined process set forth in the Guide: Obtaining Approval for a Greenhouse Stormwater Management Facility. Many greenhouses for which applications are being submitted have already been in operation for several years; most stormwater management systems for greenhouses are not highly complex; and the ECAs are being submitted as part of a ministry abatement action plan to address water quality issues as quickly as possible. Therefore, the Director feels a 31-day comment period is sufficient for this and all other greenhouse stormwater ECAs applications as opposed to the 45-day comment period used on other types of ECAs applications.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
Comment
Commenting is now closed.
This consultation was open from June 7, 2017
to July 8, 2017
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0