Cette consultation a eu lieu :
du 7 juin 2017
au 8 juillet 2017
Résumé de la décision
Sun Circle Greenhouses requested to withdraw the proposal for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility located at 725 Road 2 East, Kingsville, County of Essex.
Détails de l'emplacement
Détails de l'emplacement du site
725 Road 2 East
Kingsville
County of Essex
N9Y 2E7
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Sun Circle Greenhouses Incorporated
725 Road 2 Road East
Kingsville,
ON
N9Y 2E7
Canada
Détails de la décision
In response to Sun Circle Greenhouses' request to withdraw its proposal the ministry cancelled and closed the file on August 9, 2018.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
How to Appeal
Appeals are not allowed
The client requested the application be withdrawn, and the ministry closed the file.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility serving Sun Circle Greenhouses Inc., located at 725 Road 2 East, Kingsville, County of Essex.
The existing stormwater structure includes a roof water drainage pipe system, wet pond, an emergency spillway, outlet pipe and an oil and grit separator, and will discharge to the Scratch Wigle Drain.
Other information
Environmental Compliance Approvals (ECAs) for greenhouse stormwater management facilities follow a streamlined process set forth in the Guide: Obtaining Approval for a Greenhouse Stormwater Management Facility. Many greenhouses for which applications are being submitted have already been in operation for several years; most stormwater management systems for greenhouses are not highly complex; and the ECAs are being submitted as part of a ministry abatement action plan to address water quality issues as quickly as possible. Therefore, the Director feels a 31-day comment period is sufficient for this and all other greenhouse stormwater ECAs applications as opposed to the 45-day comment period used on other types of ECAs applications.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 7 juin 2017
au 8 juillet 2017
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0