Cette consultation a eu lieu :
du 7 septembre 2022
au 22 octobre 2022
Résumé de la décision
The company requested to withdraw their application for an Environmental Compliance Approval (air & noise). The application is considered withdrawn, and no approval was issued.
Détails de l'emplacement
Adresse du site
111 Consumers Drive
Whitby,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Patheon Inc.
111 Consumers Drive
Whitby,
ON
L1N 5Z5
Canada
Détails de la décision
The proposed project has been cancelled, no amendment approval is required for the facility; therefore, the company has decided to withdraw the application.
On July 07, 2023, the applicant requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn, and no approval was issued.
The ministry closed the file on July 10, 2023.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Application withdrawn by the applicant. As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 2003-AVYRC4 for Patheon Inc., a facility that conducts contract manufacturing of pharmaceutical products located in the City of Whitby, Regional Municipality of Durham.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- boilers
- air dryers
- drying ovens
- coating pans
- fume hoods, and
- other process equipment equipped with dust collectors and HEPA filters
The amendment includes a planned building expansion, as well as an increase in the facility production limit.
Emissions to the air from this facility include:
- ethyl ether
- pyridine
- nitrogen oxides
- ethanol
- chloroform
- particulate matter
- n-butylamine, and
- 2,2,2-trifluoroethanol.
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 7 septembre 2022
au 22 octobre 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste