TransCanada Pipelines Limited requested to withdraw their application for a Permit to Take Water (PTTW) for dewatering purposes. The application is considered withdrawn and no PTTW was issued.
Détails de l'emplacement
Adresse du site
360 Columbus Road West
Whitby,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
TransCanada Pipelines Limited
450 1st Street
Calgary,
AB
T2P 5H1
Canada
Détails de la décision
On April 21, 2022, Trans Canada Pipelines Limited requested to withdraw their application for a Permit to Take Water.
The application is considered withdrawn and no permit was issued. The ministry closed the file on June 10, 2022.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Permit to Take Water for TransCanada Pipelines Limited. Water will be taken from one well over two years for dewatering purposes in the Town of Whitby, Regional Municipality of Durham, Ontario. Details of the water taking are as follows:
Source 1: Well (2022 Excavations)
- purpose of water taking: construction - dewatering
- source of water: well
- maximum rate (litres per minute): 6,000
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 2,500,000
- maximum number of days of taking in a year: 365
- period of water taking: January 1 to December 31 for 2 years
Source 2: Well (2023 Excavations)
- purpose of water taking: construction - dewatering
- source of water: well
- maximum rate (litres per minute): 6,000
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 2,500,000
- maximum number of days of taking in a year: 365
- period of water taking: January 1 to December 31 for 2 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 11 avril 2022
au 11 mai 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0