Cette consultation a eu lieu :
du 3 mai 2019
au 2 juin 2019
Résumé de la décision
A permit to take water was not required.
Détails de l'emplacement
Détails de l'emplacement du site
Namewaminikan Hydro Project (Twin Falls)
Address: Twin Falls Crown land north of Highway 11 at Twin Falls along the Namewaminikan River Municipality of Greenstone District of Thunder Bay, Greenstone, Municipality, District of Thunder Bay
District Office: Thunder Bay - District
GeoReference: Zone: 16, UTM Easting: 430160, UTM Northing: 5507026
Site #: 1018-97APJX
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Namewaminikan Hydro Inc.
1555 Peel Street
Suite 1100
Montreal,
QC
H3A 3L8
Canada
Détails de la décision
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for an amendment to the existing Permit to Take Water No. 5738-ACGNAY for Namewaminikan Hydro Inc. for the purpose of generating hydroelectric power from Twin Falls, on the Namewaminikan River (locally known as the Sturgeon River) in the Municipality of Greenstone, District of Thunder Bay. Details of the proposed water takings are as follows:
Permit Type: Amendment
- purpose of Water Taking: Power Generation
- source of Water: Namewaminikan River (Twin Falls)
- maximum Rate (Litres Per Minute): 2,400,000
- maximum Number of Hours of Taking per Day: 24
- maximum Volume (Litres) Per Day: 3,456,000,000
- maximum Number of Days of Taking in a Year: 365
- earliest Calendar date of taking (mm/dd): 01/01
- latest Calendar date of taking (mm/dd): 12/31
Period of Taking: 10 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 3 mai 2019
au 2 juin 2019
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0