January 24, 2020 - February 23, 2020 (30 days) Closed
Last updated
The Director of Mine Rehabilitation has acknowledged receipt of the Closure Plan according to the provisions of the Mining Act. The Certified Closure Plan is now considered filed and the proponent must comply with the Closure Plan.
November 4, 2021 - December 4, 2021 (30 days) Closed
Last updated
This decision is for a renewal of Permit to Take Water No. 8336-9C2RFQ for industrial water taking purposes. Water will be taken from two wells located at the Kidd Mine Site in Timmins, Ontario, as an alternate source of industrial and potable water when water levels are low in their main industrial/potable source - Feldman Lake.
An amended Environmental Compliance Approval has been issued for an existing subsurface sewage disposal works, for Chicopee Tube Park located at 1600 River Road East in the City of Kitchener, Ontario.
November 3, 2021 - December 3, 2021 (30 days) Closed
Last updated
This proposal is for a new Permit to Take Water for Scala Residences Inc. to take water for foundation drainage. Water will be taken from one well located in the City of Toronto, Ontario. Permit To Take Water 0470-CB7QVC issued on February 1, 2022.
November 5, 2021 - December 5, 2021 (30 days) Closed
Last updated
This decision is for a new Permit to Take Water for Southport Street Development Corporation. Water will be taken from one well for dewatering purposes, located in the City of Toronto, Ontario. PTTW 1777-CB7TLG issued on February 2, 2022.
October 25, 2021 - November 24, 2021 (30 days) Closed
Last updated
This decision is to renew Permit to Take Water No. 3056-ALXFVN for 770781 Ontario Limited for commercial purposes. Water will be taken from one well for golf course irrigation at the Grand Highland Golf Club, located in Mississauga, Ontario. Permit To Take Water 0304-CB3QDX issued on February 2, 2022.
This decision is for a new Environmental Compliance Approval (air & noise) for Jozo and Kata Ilic for a sub-slab depressurization system for a multi-tenant residential building, located in the City of Kitchener, Regional Municipality of Waterloo.
February 11, 2021 - March 28, 2021 (45 days) Closed
Last updated
We have issued an amended Environmental Compliance Approval (air & noise) with Limited Operational Flexibility to Cytec Canada Inc., a phosphine and phosphine derivatives manufacturing facility located at 9061 Garner Road, Niagara Falls, Ontario.
July 26, 2019 - September 9, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval (air and noise) has been granted to CalClean, Inc. The facility undertakes soil and groundwater remediation at sites throughout Ontario.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-1818
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
May 25, 2020 - June 25, 2020 (30 days) Closed
Last updated
The ministry is seeking public input on a permit proposal from the Town of South Bruce Peninsula for beach maintenance activities that will impact Piping Plover, a species at risk in Ontario, and its habitat. The proposed permit considers species and habitat impacts, with a view to minimizing them and achieving an overall benefit for the species.
The Town of South Bruce Peninsula has withdrawn its application under section 17 of the Endangered Species Act, 2007 for a permit to authorize beach maintenance activities at Sauble Beach that would have impacted Piping Plover and its habitat.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-3512
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 2, 2021 - October 2, 2021 (30 days) Closed
Last updated
Inverness Homes Inc. has withdrawn its application for a permit to authorize construction of a residential development in Carp, Ontario that would have impacted Butternut and its habitat. As a result, no permit has been issued.
November 17, 2021 - December 17, 2021 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-21-000315 to EXIRO MINERALS CORP. for early exploration activities approximately 41 kilometres east of the town of Chapleau, Ontario, in Tooms and Greenlaw townships, District of Sudbury, Northeast Region.
November 26, 2021 - January 10, 2022 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (previous Approval #8281-AR7KWV) was issued for industrial stormwater management works servicing Cargill Limited Canada, located at 10 Cuddy Boulevard, in the City of London.
September 28, 2021 - November 12, 2021 (45 days) Closed
Last updated
An Environmental Compliance Approval for sewage works was granted to Hydro One Networks Inc.'s Mackenzie Transmission Station (Mackenzie TS), located at 14 Highway 11B, south of the town of Atikokan, Ontario.
July 29, 2021 - September 12, 2021 (45 days) Closed
Last updated
An Environmental Compliance Approval (industrial sewage works) was granted to CRH Canada Group Inc. to the Ontario Redimix (ORM) Portlands Plant for sewage works located at 8 Unwin Ave, Toronto (on Toronto Port Authority lands).
October 18, 2021 - December 2, 2021 (45 days) Closed
Last updated
An amended approval has been issued to amend existing Environmental Compliance Approval No. 7643-4K7QXM for the existing sewage works servicing The Greens at Renton Golf Club, located at 969 Concession 14, Norfolk County.
November 17, 2021 - December 17, 2021 (30 days) Closed
Last updated
This decision is for a new Permit to Take Water for Goldshore Resources Inc. for industrial water taking purposes. Water will be taken from the Wawiag River and Snodgrass Lake for a multi-drill exploration program, located in the City of Thunder Bay, Ontario.
We have approved amendments to the Trent Source Protection Plan and Assessment Report to ensure Ontario’s municipal drinking water sources continue to be protected. The amendments include updated water quality protections in the Township of Cramahe.