Sofina Foods Inc./Aliments Sofina Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9078
Ministry reference number
8739-D6ZL5V
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 19, 2024 - October 3, 2024 (45 days) Closed
Last updated

This consultation was open from:

August 19, 2024
to October 3, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Sofina Foods Inc./Aliments Sofina Inc., a producer and distributer of deli meats and other grocery products, located in the City of Belleville, Ontario.

Location details

Site address

350 Bell Boulevard
Belleville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Sofina Foods Inc./Aliments Sofina Inc.
100 Commerce Valley Drive West
Markham, ON
L3T 0A1
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Sofina Foods Inc./Aliments Sofina Inc., a producer and distributer of deli meats and other grocery products, located in the City of Belleville, Ontario.

The application includes all sources at the facility, including:

  • steam and cooking ovens,
  • chiller units,
  • storage tanks, and
  • general exhausts for the processing, sanitation, compressor and maintenance areas

Emissions to the air from this facility include:

  • nitrogen oxides,
  • carbon monoxide,
  • benzo(a)pyrene,
  • acetic acid,
  • methane, and
  • particulate matter.

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 19, 2024
to October 3, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice