This consultation was open from:
June 11, 2024
to July 26, 2024
Proposal summary
The proposal is for a new Environmental Compliance Approval (ECA) for an existing groundwater de-watering system for building construction at the Barrel Yards construction project site, located at 110 Erb Street West, in Waterloo, Ontario.
Location details
Site address
110 Erb Street West
Waterloo ,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Stonerise Construction Inc.
560 Wellington Boulevard
2nd Floor
London,
ON
N6A 3R4
Canada
Proposal details
The proposal is for a new Environmental Compliance Approval (ECA) for an existing groundwater de-watering system for building construction, using extraction wells, at the Barrel Yards construction project site, located at 110 Erb Street West in Waterloo, Ontario.
The proposed groundwater de-watering system discharges to on-site storm sewers that discharge to an existing municipal storm sewer located along Father David Bauer Drive, and eventually to Laurel Creek. The dewatering system discharges ground water generated during the construction dewatering process, with a maximum discharge rate of 5,000,000 litres per day.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from June 11, 2024
to July 26, 2024