This consultation was open from:
November 23, 2023
to January 7, 2024
Proposal summary
This proposal is for a new Environmental Compliance Approval (sewage) for Summerhill Resorts Ltd. to service the existing campsites at the Waterways RV Resort located at 3800 Big Rideau Lake Road, Portland, Ontario.
Location details
Site address
3800 Big Rideau Lake Road
Rideau Lakes,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Summerhill Resorts Ltd.
1133 Yonge Street
Toronto,
ON
M4T 2Y7
Canada
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) for Summerhill Resorts Ltd. to service the existing campsites at the Waterways RV Resort located at 3800 Big Rideau Lake Road, Portland, Ontario.
The sewage system upgrades include:
- balancing tanks
- additional septic tank capacity
- a new Waterloo Biofilter treatment system
- a new raised type A dispersal bed
The design flow of the sewage systems is 80,925 liters per day.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from November 23, 2023
to January 7, 2024