This consultation was open from:
November 1, 2023
to December 16, 2023
Proposal summary
This proposal is for a new Environmental Compliance Approval (sewage) to be issued to Gwendolyn Patricia Tanner, operating as Flood’s Landing, for the existing septic system to service a campground/trailer park, located at 913 Flood Landing Road, located in Cochrane, Ontario.
Location details
Site address
913 Flood Landing Road
Cochrane,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Gwendolyn Patricia Tanner, operating as Flood’s Landing
913 Flood Landing Road
Cochrane,
ON
P0L 1C0
Canada
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) to be issued to Gwendolyn Patricia Tanner, operating as Flood’s Landing, for the existing septic system designed for an overall capacity of 4,885 litres per day, to service a campground/trailer park located at 913 Flood Landing Road in Cochrane, Ontario.
The proposed sewage works include:
- a 57,000 litre septic tank
- a septic bed with approximate dimensions of 26 meters long and 16 meters wide, containing 146.5 meters of perforated pipes
- one 9,500 litre Class 5 Septic System holding tank
- six earthen privies and all associated appurtenances
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from November 1, 2023
to December 16, 2023