Harbour Environmental Group (NW Calgary) Ltd. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-7818
Ministry reference number
4101-CVGNMJ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
October 27, 2023 - December 11, 2023 (45 days) Closed
Last updated

This consultation was open from:

October 27, 2023
to December 11, 2023

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from Harbour Environmental Group (NW Calgary) Ltd. operating as Harbour Environmental Group Ottawa, a non-hazardous liquid soil dewatering facility, located at 1850 Bantree Street, Ottawa, Ontario.

Location details

Site address

1850 Bantree Street
Ottawa, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Harbour Environmental Group (NW Calgary) Ltd.
3500 25th Street NE
Calgary, AB
T1Y 6C1
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Harbour Environmental Group (NW Calgary) Ltd. operating as Harbour Environmental Group Ottawa, a non-hazardous liquid soil dewatering facility, located at 1850 Bantree Street, Ottawa, Ontario.

The application includes all sources at the facility, including three shakers, screener, various conveyors, material storage tanks, material handling and associated diesel engines operating with a Facility Production Limit of 450 tonnes of liquid soil per day.

Emissions to the air from this facility include:

  • particulate matter
  • benzene
  • nitrogen oxides and other products of combustion, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from October 27, 2023
to December 11, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice