This consultation was open from:
March 31, 2023
to May 1, 2023
Decision summary
Approval was granted for a site plan amendment to allow Marcel Brazeau Limited to amend several operational details on the site plan for Licence No. 4177, operating in the City of Ottawa.
Location details
Site location details
City of Ottawa, Ottawa-Carleton Region.
Part Lot 12, Concession IV RF, Geographic Township of Nepean.
The site is Aggregate Resources Act (ARA) licence No. 4177.
The site is adjacent to the Southern boundary of ARA licence No. 4052 and Northern boundary of licence No. 4065.
A link to our mapping tool allows you to locate and view licensed sites under the ARA.
Proponent(s)
Marcel Brazeau Limited
4338 Innes Road
Ottawa,
ON
K4A 3W3
Canada
Decision details
The changes to the site plan for ARA Licence No. 4177 were approved by the Director on May 2, 2024.
This approval authorizes the following site plan amendments:
- to allow a change to the sequence of excavation,
- import fill to refill the land to pre-extraction elevations,
- to change the final rehabilitation plan from a pond to filled land.
A copy of the approved site plan for this licenced site can be obtained from the Contact identified below.
Effects of consultation
0 comments were received in response to the Environmental Registry notice. The proponent has addressed all comments.
1 comment was received through the ARA consultation process.
The concerns were related to:
- Final Rehabilitation
- Importation of excess soil
- Site Plan notes related to the operation.
The concerns were addressed by providing additional information and revisions to the site plan.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Sonya Zuber
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Original proposal
Proposal details
Application has been made by Marcel Brazeau Limited to amend the current site plan to allow a change to the sequence of excavation, import fill to refill the land to pre-extraction elevations, and to change the final rehabilitation plan from a pond to filled land.
Public consultation opportunities
The proposal request for this licence is being circulated within the Ministry of Natural Resources and Forestry. Additionally, notification of this application has been forwarded to the City of Ottawa, Rideau Valley Conservation Authority, and any landowners within 120 metres of the licensed boundary that do not currently have an approved aggregate licence on the property for comment.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Comment
Commenting is now closed.
This consultation was open from March 31, 2023
to May 1, 2023
Connect with us
Contact
Sonya Zuber
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Comments received
Through the registry
0By email
1By mail
0