Update Announcement
This proposal notice was updated on September 17th, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.
This consultation was open from:
March 17, 2023
to April 16, 2023
Proposal summary
This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.
Location details
Site address
Timmins,
ON
Canada
Site location details
Hart Mine approximately 26.5 kilometres south east from Timmins and 7 kilometres east from Redstone Mine.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Pure North Resources Inc.
Post Office Box No. 5114
South Porcupine,
ON
P0N 1H0
Canada
Proposal details
This proposal is to renew Permit to Take Water No. 4137-8MYQWU for Pure North Resources Inc. Water will be taken for industrial and dewatering purposes at the Hart Mine and McWatters Mine sites, located in Timmins, Ontario.Details of the water taking are as follows:
Source name: Hart Mine Ramp/Normal Operational Rate
- purpose: dewatering
- maximum rate per minute (litres): 420
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 605,000
- maximum number of days of taking per year: 245
- period of taking: January 1 to December 31 for 10 years
Source name: Hart Mine Ramp/Spring Freshet Rate
- purpose: dewatering
- maximum rate per minute (litres): 694
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,000,000
- maximum number of days of taking per year: 120
- period of taking: April 1 to June 30 for 10 years
Source name: McWatters Water Pond
- purpose: industrial
- maximum rate per minute (litres): 208
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 300,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from March 17, 2023
to April 16, 2023