This consultation was open from:
January 13, 2022
to February 27, 2022
Decision summary
We issued the amended Environmental Compliance Approval for the use and operation of 7.2 hectare waste disposal/transfer site within a total site area of 79.7 hectares with a capacity of 270,330 cubic meters.
Location details
Site address
1 Government Road
Kapuskasing,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Produits Forestiers GreenFirst (QC) Inc.
401 The West Mall
Suite 1000
Toronto,
ON
M9C 5J5
Canada
Decision details
Amended approval is for the use and operation of 7.2 hectare waste disposal/transfer site within a total site area of 79.7 hectares with a capacity of 270,330 cubic meters. This capacity includes historical waste already deposited in the landfill.
Maximum volume of wood waste that is approved for storing is 75,000 cubic meters.
The site is allowed to operate 24 hours a day and 7 days a week, as necessary.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
How to Appeal
This instrument decision can be appealed. You have 15 days from August 31, 2023 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Produits Forestiers GreenFirst (QC) Inc.
401 The West Mall
Suite 1000
Toronto,
ON
M9C 5J5
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is to amend Environmental Compliance Approval (waste disposal site) No. A612011 for a non-hazardous waste disposal site for the management of 100% non-hazardous biomass residuals, including woody biomass and wastewater treatment plant solids generated by the manufacturing and environmental control practices at the on-site pulp and paper and wood products facilities.
The facility is a 350-hectare property located in the Town of Kapuskasing, District of Cochrane. The facility operates 24 hours a day, seven days a week. The amendment includes the following modifications:
- increase the maximum storage capacity of biomass residuals from 16,440 metric tons to 25,050 metric tons
- allow for flexibility with on-site storage locations and quantities for biomass residuals
- reflect the potential use of wood ash for agricultural land application
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from January 13, 2022
to February 27, 2022
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0