This consultation was open from:
September 22, 2021
to October 22, 2021
Decision summary
The Director of Exploration has made a decision on the exploration permit application PR-21-000243 to Battery Mineral Resources Limited for early exploration activities in Dufferin and North Williams Townships; Territorial District of Temiskaming, Northeast Region.
The decision is to : Issue
Location details
Site location details
The mining activities are located approximately 125 km southeast of Timmins, Ontario, in Dufferin and North Williams Townships; Territorial District of Temiskaming, Northeast Region.
Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”
Claim numbers: 127746, 175111, 208567
Lease numbers instructions: “To view individual leases on a map please use the Mining Lands Administration System. Click on “Search by Location” and select “Mining Lease” to search by lease numbers or “Find a township” to search by township.”
Lease numbers: LEA-108325
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Battery Mineral Resources Limited
2900 - 550 Burrard Street
Vancouver,
BC
V6C 0A3
Canada
Decision details
On September 21, 2021 the ministry issued an exploration permit approximately 125 kms southeast of Timmins, Ontario, in Dufferin and North Williams Townships; Territorial District of Temiskaming, Northeast Region to mechanized drill and strip.
This permit will allow the company to conduct mechanized drilling, mechanized stripping, line cutting, and geophysical survey requiring generator type
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The issued exploration permit is valid for a period of three years from the date of issue.
Effects of consultation
No comment were received through the Environmental Registry of Ontario resulting in no impact on the decision to proceed or not with this proposal.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Michael Young
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Original proposal
Proposal details
Battery Mineral Resources Limited has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow Battery Mineral Resources Limited to carry out are as follows: (keep those that apply to the application)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
- mechanized stripping (greater than 100 square metres in a 200 metres radius)
Plan activities (if applicable)
- line cutting (less than 1.5 metres width)
- geophysical survey requiring generator type
The potential disturbance from the activities are described as: (only keep those activities that apply to the application)
Mechanized surface stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comment
Commenting is now closed.
This consultation was open from September 22, 2021
to October 22, 2021
Connect with us
Contact
Michael Young
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comments received
Through the registry
0By email
0By mail
0