Amazon Canada Fufillment Services, Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-4261
Ministry reference number
2820-BYCJAR
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
August 31, 2021 - October 15, 2021 (45 days) Closed
Last updated

This consultation was open from:
August 31, 2021
to October 15, 2021

Decision summary

Amazon Canada Fulfillment Services, Inc. requested to withdraw their application for an Environmental Compliance Approval (sewage). The application is considered withdrawn and no approval was issued.

Location details

Site address

580 Industrial Road
London, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Amazon Canada Fufillment Services, Inc.
885 Georgia Street West
Unit 800
Vancouver, BC
V6C 2G2
Canada

Decision details

On June 7, 2022, Amazon Canada Fulfillment Services, Inc. requested to withdraw their application for an Environmental Compliance Approval (sewage).

The application is considered withdrawn and no approval was issued. The ministry closed the file on June 24, 2022.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

London District Office (Southwest Region)
Address

733 Exeter Road
London, ON
N6E 1L3
Canada

Office phone number
Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Appeals are not allowed

As no decision was made, there is no leave to appeal.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-4261
Ministry reference number
2820-BYCJAR
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

August 31, 2021 - October 15, 2021 (45 days)

Proposal details

The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Amazon Canada Fulfillment Services, Inc. at 580 Industrial Road, London, Ontario, Canada.

The proposed work consists of developing an existing vegetated area to expand a large parking area only, with no building expansions or alterations to the existing building structure. Due to the expansion of the parking lot area into existing vegetated area, additional surface runoff will discharge off-site and would require additional water quality and quantity control to not cause detrimental impacts to the downstream outlet.

The objective for these stormwater management facilities is to provide water quality treatment and water quantity control in accordance with the city’s requirements for development within the City of London. The proposed facilities will consist of an underground chamber storage system (StormTech SC-740 or approved equivalent) with the capacity to accept surface runoff up to and including the 100-year storm event for the proposed parking lot area, and provide water quality treatment prior to discharging downstream.

The outlet of the system will be to the existing storm sewer system, which will be maintained to collect runoff from the existing roof drainage and parking lot area. LittaTrap catch basin filters (or approved equivalent) will also be installed in existing catch basin openings (where depth to invert is greater than 500 millimetres) to provide additional water quality treatment of runoff to the existing storm sewer system.

An existing oil/grit separator (Wilkinson unit) will be maintained to provide further water quality treatment for the majority of the site. The existing discharge control and location (municipal servicing on Industrial Road, eventually discharging into Pottersburg Creek) will be maintained to regulate discharge as per city’s requirements.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from August 31, 2021
to October 15, 2021

Connect with us

Contact