Asahi Refining Canada Ltd. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-3948
Ministry reference number
7585-BZVS62
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
July 5, 2021 - August 19, 2021 (45 days) Closed
Last updated

This consultation was open from:
July 5, 2021
to August 19, 2021

Decision summary

An amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No.9814-AVWMLT was issued to Asahi Refining Canada Ltd., a precious metals refinery located in the City of Brampton.

Location details

Site address

130 Glidden Road
Brampton, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Asahi Refining Canada Ltd.
130 Glidden Road
Brampton, ON
L6W 3M8
Canada

Decision details

An amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9814-AVWMLT was issued to Asahi Refining Canada Ltd., a precious metals refinery located in the City of Brampton.

The emission sources from the manufacturing and associated processes that exhaust to the air include:

  • testing
  • melting
  • gold refining
  • silver refining
  • pouring and finishing processes
  • sweeps drying, grinding and screening
  • equipment and any other ancillary and support processes and activities

The amendment includes the installation of a natural gas fired generator that will be used for peak shaving.

Emissions to the air from this facility include:

  • cadmium
  • suspended particulate matter
  • mercury chloride
  • products of combustion such as nitrogen oxides

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at the time to renew these conditions.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

How to Appeal

This instrument decision can be appealed. You have 15 days from February 11, 2022 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Bijal Shah
Manager (A) | Air Approvals

Environmental Permissions Branch
135 St. Clair Avenue West
1st Floor
Toronto, ON
M4V 1P5
Canada

416-314-8316

Proponent(s)

Asahi Refining Canada Ltd.
130 Glidden Road
Brampton, ON
L6W 3M8
Canada


Appellate body

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Include the following:

ERO number
019-3948
Ministry reference number
7585-BZVS62

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-3948
Ministry reference number
7585-BZVS62
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

July 5, 2021 - August 19, 2021 (45 days)

Proposal details

Note: We updated the notice on July 08, 2021 to clarify that the natural gas fired generator will be used for peak shaving.

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9814-AVWMLT for Asahi Refining Canada Ltd., a precious metals refinery located in the City of Brampton.

The emission sources from the manufacturing and associated processes that exhaust to the air include:

  • testing
  • melting
  • gold refining
  • silver refining
  • pouring and finishing processes
  • sweeps drying, grinding and screening
  • equipment and any other ancillary and support processes and activities.

The amendment includes the installation of a natural gas fired generator that will be used for peak shaving.

Emissions to the air from this facility include:

  • cadmium
  • suspended particulate matter
  • mercury chloride
  • products of combustion such as nitrogen oxides

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that Page 2 time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from July 5, 2021
to August 19, 2021