This consultation was open from:
March 31, 2021
to April 30, 2021
Decision summary
This Permit to Take Water for M Richgrove Corp. for construction-dewatering purposes was approved. Water will be taken from a well (array) for temporary dewatering and permanent drainage in relation to the proposed residential redevelopment at 610 Martin Grove Road, Toronto. The permit was issued June 11, 2021 under permit No.3162-C3LQDN.
Location details
Site address
610 Martin Grove Road
Toronto,
ON
M9R 2L2
Canada
Site location details
610 Martin Grove Road (Block B, M-1157)
Toronto, Ontario
M9R 2L2
(also known as 7 Richgrove Drive)
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
M Richgrove Corp.
Suite 200 - 180 Kent St
Ottawa ,
ON
K1P 0B6
Canada
Decision details
This Permit to Take Water for M Richgrove Corp. to redevelop the property located at 610 Martin Grove Road, Toronto, Ontario was approved. Water will be taken from a well (array) for temporary dewatering and permanent drainage in relation to the proposed residential redevelopment.
Details of water taking are as follows:
Source name: well array
- purpose: construction dewatering
- maximum rate per minute: 532 litres per minute
- maximum number of hours of taking a day: 24
- maximum volume per day: 766,000 litres per day
- maximum number of days of taking in a year: 365
- duration: up to 10 years (start June 7, 2021 and extend to October 29, 2025)
Source name: foundation drain
- purpose: miscellaneous
- maximum rate per minute: 60 litres per minute
- maximum number of hours of taking a day: 24
- maximum volume per day: 86,000 litres per day
- maximum number of days of taking in a year: 365
- duration: up to 10 years - the foundation drainage permit would be from October 30, 2025 onward (10 years)
Effects of consultation
No comments received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from June 11, 2021 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.
Appeal process for decisions published before June 1, 2021
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
M Richgrove Corp.
Suite 200 - 180 Kent St
Ottawa ,
ON
K1P 0B6
Canada
Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Permit to Take Water for M Richgrove Corp. to redevelop the property located at 610 Martin Grove Road, Toronto, Ontario. Water will be taken from a well (array) for temporary dewatering and permanent drainage in relation to the proposed residential redevelopment.
Details of water taking are as follows:
Source name: well array
- purpose: construction dewatering
- maximum rate per minute: 532 litres per minute
- maximum number of hours of taking a day: 24
- maximum volume per day: 766,000 litres per day
- maximum number of days of taking in a year: 365
- duration: up to 10 years (start June 7, 2021 and extend to October 29, 2025)
Source name: foundation drain
- purpose: miscellaneous
- maximum rate per minute: 60 litres per minute
- maximum number of hours of taking a day: 24
- maximum volume per day: 86,000 litres per day
- maximum number of days of taking in a year: 365
- duration: up to 10 years - the foundation drainage permit would be from October 30, 2025 onward (ten years)
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from March 31, 2021
to April 30, 2021
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0