Update Announcement
The proposal notice was posted in error. The comment period on this notice has been closed and a decision notice posted to advise the public that the ministry is no longer proposing to issue this instrument.
This consultation was open from:
March 25, 2021
to April 19, 2021
Decision summary
The proposal notice was posted in error. The ministry has not issued this approval.
Location details
Site address
Lots 21B, 53B, 63B and Part of Lot 77B Registered Plan 69
Penetanguishene,
ON
Canada
Site location details
St. Andrew's Lake Village Development
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
1359870 Ontario Limited
45 Robillard Drive
Penetanguishene,
ON
L9M 1G9
Canada
Decision details
The proposal notice was posted in error. The ministry is no longer proposing to issue the instrument described in this notice.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
135 St. Clair Avenue West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
The ministry is no longer proposing to issue the instrument described.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) to be issued to 1359870 Ontario Limited, for the establishment of sewage works, in support of a proposed residential as well as a small commercial Block development, for the collection, transmission, treatment and disposal of stormwater run-off from a land legally described as Lots 21B, 53B, 63B and part of Lot 77B Registered Plan 69, in the Town of Penetanguishene.
The sewage works will consist of:
- two stormwater management facilities
- two oil and grit separator units for quantity and quality control
- storm sewers and sanitary sewers
The discharge is within the St. Andrew's Lake Watershed.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from March 25, 2021
to April 19, 2021
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0