Drain Bros. Excavating Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-2967
Ministry reference number
2541-BJRTBE2
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
January 12, 2021 - February 26, 2021 (45 days) Closed
Last updated

This consultation was open from:
January 12, 2021
to February 26, 2021

Decision summary

We issued a new Environmental Compliance Approval (air & noise) with Limited Operational Flexibility to Drain Bros. Excavating Limited to operate a combined heat and power unit to provide electrical power for an associated ethanol production facility, and the production of biodiesel, in the Township of Havelock-Belmont-Methuen.

Location details

Site address

6830 Highway 7
Havelock-Belmont-Methuen, ON
K0L 1Z0
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Drain Bros. Excavating Limited
2130 8th Road North
Dummer, ON
K0L 2H0
Canada

Decision details

We issued a new Environmental Compliance Approval (air & noise) with Limited Operational Flexibility to Drain Bros. Excavating Limited to operate a combined heat and power unit to provide electrical power for an associated ethanol production facility, and the production biodiesel assumed from the ethanol production facility. The Drain Bros. Excavating Limited facility is located at 6830 Highway 7 in the Township of Havelock-Belmont-Methuen.

This approval replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions.

Drain Bros. Excavating Limited was issued the subject Environmental Compliance Approval No. 2186-BYRJWV on September 22, 2021.

The approval includes all emissions from this facility and the Kawartha Ethanol Inc. fuel grade ethanol production facility and Drain Bros. Excavating Limited quarrying and aggregate operations that shares the site.

The approval includes all sources at the facility, including:

  • the the combined heat and power unit
  • biodiesel production facility
  • ancillary processes/equipment.

Emissions to the air from this facility include:

  • volatile organic compounds
  • benzene
  • particulate matter
  • silica
  • nitrogen oxides
  • other products of combustion

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

How to Appeal

This instrument decision can be appealed. You have 15 days from September 24, 2021 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Neryed Ragbar
Manager (A) Air Approvals

Environmental Permissions Branch
135 St Clair Avenue West
Floor 3
Toronto, ON
M4V 1P5
Canada

437 776 8348

Proponent(s)

Drain Bros. Excavating Limited
2130 8th Road North
Dummer, ON
K0L 2H0
Canada


Appellate body

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Include the following:

ERO number
019-2967
Ministry reference number
2541-BJRTBE2

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-2967
Ministry reference number
2541-BJRTBE2
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

January 12, 2021 - February 26, 2021 (45 days)

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) to be issued to Drain Bros. Excavating Limited.

This approval replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new or historically unapproved sources for all emissions.

This facility produces biodiesel and operates a combined heat and power (CHP) unit to produce heat and power for an associated ethanol production facility, located in the Township of Havelock-Belmont-Methuen, Ontario.

The proposal includes all sources at the facility, including the biodiesel production facility and ancillary processes/equipment, and CHP unit.

Emissions to the air from this facility include:

  • volatile organic compounds
  • benzene
  • particulate matter
  • silica
  • nitrogen oxides
  • other products of combustion

This proposal includes all emissions from this facility and from the Kawartha Ethanol Inc. facility that shares the site.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from January 12, 2021
to February 26, 2021

Connect with us

Contact