This consultation was open from:
October 21, 2020
to December 5, 2020
Decision summary
No decision will be made at this time as the applicant has withdrawn their application for an Environmental Compliance Approval.
Location details
Site address
571 Welham Road
Barrie,
ON
Canada
Site location details
E360 Waste Processing Site
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Environmental 360 Solutions Ltd.
1815 Ironstone Manor
Suite 8
Pickering,
ON
L1W 3W9
Canada
Decision details
The applicant has withdrawn the application for an Environmental Compliance Approval. A letter from the ministry's Environmental Permissions Branch was sent to the applicant on November 18, 2020, informing the applicant that the application is now considered withdrawn and the file closed.
The applicant was also reminded in the letter that, under section 20.2 of Part II.1 of the Environmental Protection Act, they are required to obtain an approval under section 20.3 of Part II.1 of the Act before construction, alteration, extension, replacement or change of use of a waste disposal site.
Effects of consultation
No decision was made on the application. As a result any comments submitted through the Registry were not reviewed and/or considered at this time.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
The application has been withdrawn and, as a result, no decision was made but the ministry.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (waste processing site) for Environmental 360 Solutions Ltd. for a non-hazardous waste transfer/processing facility to be located at 571 Welham Road, Barrie, Ontario on a site that is 2.45 hectares in area.
Activities at the facility include
- waste tire collection,
- sorting,
- crumbling,
- screening,
- loading of crumb rubber in bags, and
- shipping.
Equipment used at the site include;
- a chip feed bin,
- a heavy feed auger,
- mechanical crumblers,
- a gyratory screen,
- pneumatic conveyors,
- fiber filers,
- a super sack station,
- a digital scale platform,
- a crumb rubber eco brain,
- a troughed conveyor,
- a mechanical grater,
- belt magnets,
- vibratory conveyors,
- a drum magnet and a
- venturi scrubber.
The site will handle a total maximum amount of 120 tonnes of waste tires per day. The maximum total amount that can be stored in the facility would be two days of production (240 tonnes). The site will service the Province of Ontario and business hours are 7 am to 7 pm, Monday to Friday. Processing and loading of crumb rubber for shipping occurs outside of business hours.
The facility exports the residual waste, in the form of fibers, to local landfills. It is not uncommon for the tractor-trailer removals to appear on-site before or after the business hours.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from October 21, 2020
to December 5, 2020
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
1By email
0By mail
0